Home » Construction Drawings » Pole Contacts
Pole Contacts
- A1 — Registration and Annual Reporting Form (Uploaded October 7, 2021)
- Approved Permit Form (Uploaded October 7, 2021)
- B1 — PEC Standard Pole Attachment Application (Uploaded October 7, 2021)
- B2 — Standard Wireless Installation Application (Uploaded October 7, 2021)
- B3 — Standard Mid-Span Installation Application (Uploaded October 7, 2021)
- B4 — Request for Pre-Certification of Wireless System (Uploaded October 7, 2021)
- B5 — Authorization for Make-Ready Work (Uploaded October 7, 2021)
- B6 — Completion of Attaching Entity Construction (Uploaded October 7, 2021)
- B7 — Notice of Safety Violation and Safety Assessment Charge (Uploaded October 7, 2021)
- B8 — Notice to Proceed (Uploaded October 7, 2021)
- B9 — Notice of Unauthorized Attachment or Unauthorized Wireless Installation (Uploaded October 7, 2021)
- B10 — Notice to Remove Attachment (Uploaded October 7, 2021)
- Osmose Pricing 2022 (Uploaded September 6, 2022)
- PEC Pole Attachment Standards (Uploaded June 6, 2022)
- PEC Rate Summary — 2020 Data (Uploaded December 2, 2021)
- PEC Surety Bond Form 2020 (Uploaded October 7, 2021)
[/searchwp_no_index]