Home » Construction Drawings » Underground Specifications
Underground Specifications
- 1Φ Padmount Transformer Dead End (Uploaded December 21, 2018)
- 1Φ Padmount Transformer Feed Through (Uploaded December 21, 2018)
- 1Φ Padmount Transformer Two-Way Feed (Uploaded December 21, 2018)
- 3Φ Padmount Transformer Dead End (Uploaded December 17, 2013)
- 3Φ Padmount Transformer Feed Through (Uploaded December 17, 2013)
- 3Φ Padmount Transformer Two-Way Feed (Uploaded December 17, 2013)
- 600-Amp Miscellaneous Assemblies (Uploaded December 17, 2013)
- 600-Amp T Connectors (Uploaded December 17, 2013)
- Fault Indicators (Uploaded December 17, 2013)
- Junction Terminals for Vault Applications (Uploaded December 17, 2013)
- Junction Terminals for Above-Ground Enclosures (Uploaded December 17, 2013)
- Miscellaneous URD Assemblies (Uploaded December 21, 2018)
- Precast Pad for Pedestal (Uploaded August 28, 2018)
- Precast Pad for Transformer (Uploaded August 28, 2018)
- Primary Enclosure Grounds (Uploaded December 17, 2013)
- Primary Enclosures (Uploaded December 17, 2013)
- Primary Enclosures with Spacer (Uploaded September 24, 2015)
- Riser MVIs (Uploaded December 17, 2013)
- Secondary 1Φ Transformer Connectors (Uploaded December 17, 2013)
- Secondary Connectors for URD Pedestals (Uploaded December 17, 2013)
- Secondary Enclosures and Pedestals (Uploaded December 17, 2013)
- Secondary Transformer Paddles (Uploaded December 17, 2013)
- Typical Switchgear Figure 9 (Uploaded December 17, 2013)
- Typical Switchgear Figure 11 (Uploaded December 17, 2013)
- Underground Construction Specifications (Includes all the above; uploaded December 21, 2018)
[/searchwp_no_index]