Home » Construction Drawings » Overhead Construction Drawings
Overhead Construction Drawings
- A — 1Φ Assembly Units (Uploaded December 13, 2022)
- B — 1Φ to 3Φ Conversion Assembly Units (Uploaded December 13, 2022)
- C — 3Φ Assembly Units (Uploaded December 13, 2022)
- C — Double Circuit Configuration (Uploaded September 5, 2025)
- E — Guy Assembly Units (Uploaded November 26, 2019)
- F — Anchor Assembly Units (Uploaded August 31, 2018)
- G — Transformer Assembly Units (Uploaded August 10, 2021)
- J — Secondary Assembly Units (Uploaded July 5, 2012)
- K — Service Assembly Units (Uploaded July 12, 2012)
- L — Lighting Assembly Units (Uploaded January 23, 2023)
- M2 — Grounding Assembly Units (Uploaded January 13, 2025)
- M3 — Sectionalizing Assembly Units (Uploaded January 31, 2024)
- M5 — Miscellaneous Assembly Units (Uploaded February 7, 2024)
- M7 — Regulator Assembly Units (Uploaded March 1, 2021)
- M8 — Metering Assembly Units (Uploaded August 18, 2020)
- M9 — Capacitor Assembly Units (Uploaded April 10, 2013)
- M40 — Ties, Armor Rods, & Warning Balls Assembly Units (Uploaded April 10, 2013)
- M41 & M42 — Angle & Dead-End Shoes, Splices Assembly Units (Uploaded April 10, 2013)
- VUM — Underground Riser Assembly Units (Uploaded December 6, 2024)
- Z-35 kV & Non-Wood Pole Framing Assembly Units (Uploaded December 21, 2018)
- ZM — Non-Wood Miscellaneous Assembly Units (Uploaded April 10, 2013)
[/searchwp_no_index]