Transmission line rights of way

PEC operates hundreds of miles of electric transmission lines that move power throughout Central Texas. Maintaining the transmission line right of way is critical to public safety and the reliability of the state’s power grid.

PEC seeks to be a good steward of the environment. Everything we do as a co-op, we do with respect and by putting the greater good first. Part of that means prioritizing the safety of you, the public, and our employees.

What is a right of way?

A transmission line right of way is the strip of land used to construct, operate, maintain, and repair transmission lines and facilities. The right of way is the area of land established and described in an easement.

Rights of way can come from easements or be granted by entities like cities. An easement grants PEC the legal rights to build, operate, and maintain transmission lines and structures on private property. The landowner retains ownership of the property, subject to PEC’s rights. The landowner’s use within the easement is limited to those that do not limit our access to the lines, compromise the safety and reliability of the lines, or otherwise interfere with PEC’s rights.

The width of a transmission line right of way can vary and is generally 60-100 feet, but can be larger. The width depends on line voltage, distance between structures, and the specific rights granted in the easement. The transmission line is usually centered in the right of way, and generally must remain clear of anything that could interfere with safe operations or access to the transmission line.

Maintaining the transmission line right of way

PEC conducts regular inspections, safety patrols, scheduled maintenance, and repairs along the right of way to ensure public safety and transmission system reliability.

Proper vegetation maintenance practices help prevent injury and fire by eliminating potential electrical contact and arcing between the transmission line and vegetation. It also allows us to have access to our facilities to perform maintenance and repairs on a regular basis.

We follow applicable standards for vegetation maintenance, but we don’t have a one-size-fits-all approach. We will maintain a fully cleared right of way if it is the most efficient, effective, and safest option. Low-growing, native species are allowed where appropriate to help manage the spread of undesirable species.

We trim trees and other vegetation as needed and only use herbicides reviewed and approved by PEC’s environmental affairs team. In the uncommon event of an issue arising, PEC will work with the landowner to find a solution. Removal of mature trees may be necessary if they cannot be pruned to ensure safe and effective operation of the transmission line.

Using your land

Many land uses within the right of way generally don’t interfere with the safe operation of the transmission line, including farming, grazing, gardening, hunting, biking, and hiking. Other uses are restricted. It’s important to call us before adding improvements or making changes to the grade within the right of way. If we discover obstructions in the right of way that pose safety, access, or operational issues, we will require you to restore the right of way back to its original condition at your own expense. Contacting us beforehand can save you time, money, and frustration.

  • We patrol transmission line rights of way regularly, so you may see us looking for safety or access concerns, performing vegetation management, and completing light construction.
  • We will provide advance written notice before entering your private property for regularly scheduled vegetation clearing or major transmission line repairs. Advance notice may not be possible in the event of an emergency.
  • PEC will minimize disruptions as much as possible while maintaining the transmission line to ensure both public safety and electric reliability.
  • If issues arise, we’ll work together to find solutions whenever possible. We’ll always treat you and your property with respect.
  • Always avoid the following within the right of way:
    • Building permanent structures such as light poles, signs, buildings, swimming pools, etc.
    • Storing combustible materials, including wood and trash.
    • Constructing ponds, septic tanks, and drainage fields.
    • Creating or storing piles of debris, rubble, or dirt.
    • Leaving abandoned vehicles.
  • Contact PEC before starting any activity that will change or has the potential to change the finished grade or slope within the right of way.
  • Consider clearance distance. The National Electrical Safety Code, American National Standard Institute, and state law require minimum clearance distances between the transmission line and objects within the right of way. Minimum distances vary, as wires can sag significantly depending on the weather and amount of current. On windy days, the wires will sway horizontally, sometimes near the edge of the right of way. Clearances must be maintained in all conditions.
  • Low-growing crops and grasses are welcome in the right of way as long as the plantings maintain safe clearances and do not hinder access. Low-growing vegetation with a mature height of 10 feet or less can generally be planted in the outer edges of the right of way. Native plants and grasses inhibit the quick growth of invasive species and improve biodiversity and native habitat. Please don’t install irrigation or septic systems within the right of way, as they can be damaged by equipment used to access the transmission line.
  • Follow these strict guidelines for temporary structures:
    • Temporary structures like fences and gates must be properly grounded and meet the electrical clearance requirements noted above.
    • Fences must not obstruct access or impede movement up and down the right of way.
    • Gate locks shall include either a PEC standard lock or an electric gate code/override key.
    • Dumpsters shall not be placed within the right of way.
PEC transmission line and pole in right of way
Search